πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Virginia

ONSHORE WIND Β· PJM

Onshore wind project AC2-003, Botetourt County

Onshore wind project AC2-003, Botetourt County is a 78.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Botetourt County, Virginia, connecting to Dominion.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2016 (completed)
  2. Withdrawn / abandonedDec 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AC2-003
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dominion
Location
Botetourt County, Virginia
Technology
Wind: 78.0 MW
Total requested
78.0 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
1 November 2016
Proposed online date
October 2023
Withdrawn
December 2016

Location

Marker shows the centre of Botetourt County; the queue data does not give exact sites.

Power plants in Virginia Β· Transmission lines in Virginia

Other requests in Botetourt County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem