United States β€Ί Grid β€Ί Interconnection queues β€Ί New Mexico

SOLAR + STORAGE Β· SPP

Solar + storage project GEN-2021-083, Chaves County

Solar + storage project GEN-2021-083, Chaves County is a 50.0 MW solar + storage request withdrawn in the SPP interconnection queue, in Chaves County, New Mexico, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedSep 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingSep 2024 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2021-083
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
SPP / Central Valley Electric Cooperative (CV) 69 kV transmission line
Location
Chaves County, New Mexico
Technology
Solar: 50.0 MW Β· Battery
Total requested
50.0 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
26 April 2021
Proposed online date
September 2024
Came online
September 2024
Withdrawn
September 2024

Location

Marker shows the centre of Chaves County; the queue data does not give exact sites.

Power plants in New Mexico Β· Transmission lines in New Mexico

Other requests in Chaves County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem