United States β€Ί Grid β€Ί Interconnection queues β€Ί Oklahoma

ONSHORE WIND Β· SPP

Onshore wind project GEN-2016-063, Johnston County

Onshore wind project GEN-2016-063, Johnston County is a 200 MW onshore wind request withdrawn in the SPP interconnection queue, in Johnston County, Oklahoma, connecting to OGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2016 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingJun 2023 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2016-063
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
OGE
Connection point (POI)
Hugo-Sunnyside 345 kV
Location
Johnston County, Oklahoma
Technology
Wind: 200 MW
Total requested
200 MW
Service type
NRIS and ERIS
Study phase
TERMINATED
Queue status
Withdrawn
Entered queue
30 March 2016
Proposed online date
June 2023
Came online
June 2023

Location

Marker shows the centre of Johnston County; the queue data does not give exact sites.

Power plants in Oklahoma Β· Transmission lines in Oklahoma

Other requests in Johnston County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem