SOLAR Β· SOUTHEASTSolar project 138340, Robeson County
Solar project 138340, Robeson County is a 74.0 MW solar request withdrawn in the Southeast interconnection queue, in Robeson County, North Carolina, connecting to Duke Energy Progress.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 138340
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Progress
- Connection point (POI)
- Weatherspoon-Libbey Owens Ford 115 kV
- Location
- Robeson County, North Carolina
- Technology
- Solar: 74.0 MW
- Total requested
- 74.0 MW
- Service type
- Other
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 2 December 2020
Location
Marker shows the centre of Robeson County; the queue data does not give exact sites.
Power plants in North Carolina Β· Transmission lines in North Carolina
Other requests in Robeson County
- Battery storage project 898999, Robeson CountyBattery storage Β· 200 MW Β· agreement signed
- Other project 977328, Robeson CountyOther Β· 199 MW Β· in study
- Other project PP00047, Robeson CountyOther Β· 199 MW Β· in study
- Battery storage project 956244, Robeson CountyBattery storage Β· 99.0 MW Β· in study
- Battery storage project PP00026, Robeson CountyBattery storage Β· 99.0 MW Β· in study
- Solar project 963472, Robeson CountySolar Β· 70.0 MW Β· in study
- Other project PP00036, Robeson CountyOther Β· 70.0 MW Β· in study
- Solar project 977893, Robeson CountySolar Β· 5.0 MW Β· in study
- Solar project 977894, Robeson CountySolar Β· 5.0 MW Β· in study
- Solar project 911073, Robeson CountySolar Β· 80.0 MW Β· withdrawn
- Solar project 962733, Robeson CountySolar Β· 80.0 MW Β· withdrawn
- Solar project 977265, Robeson CountySolar Β· 80.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem