United States βΊ Grid βΊ Interconnection queues βΊ Indiana
ONSHORE WIND Β· MISOOnshore wind project J083, Warren County
Onshore wind project J083, Warren County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Warren County, Indiana.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2009 (completed)
- Withdrawn / abandonedFeb 2011 (project stopped here)
- ConsentedFeb 2011 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J083
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- South Prairie - Westwood 138kV
- Location
- Warren County, Indiana
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- DPP - SIS
- Queue status
- Withdrawn
- Entered queue
- 5 October 2009
- Agreement signed
- 7 February 2011
- Proposed online date
- December 2012
- Withdrawn
- February 2011
Location
Marker shows the centre of Warren County; the queue data does not give exact sites.
Other requests in Warren County
- Onshore wind project U1-024, Warren CountyOnshore wind Β· 500 MW Β· withdrawn
- Onshore wind project AD2-138, Warren CountyOnshore wind Β· 200 MW Β· withdrawn
- Battery storage project AH1-502, Warren CountyBattery storage Β· 150 MW Β· withdrawn
- Solar + storage project J2615, Warren CountySolar + storage Β· 145 MW Β· withdrawn
- Solar + storage project J2318, Warren CountySolar + storage Β· 75.0 MW Β· withdrawn
- Onshore wind project J1774, Warren CountyOnshore wind Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem