United States › Grid › Interconnection queues › New York

BATTERY STORAGE · NYISO

Bethpage Large Battery Energy Storage Project

Bethpage Large Battery Energy Storage Project is a 24.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Nassau County, New York, connecting to LIPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1202
Grid region
NYISO (New York)
Utility / transmission owner
LIPA
Developer
Calpine Mid-Atlantic Development, LLC
Connection point (POI)
Grumman 69kV substation
Location
Nassau County, New York
Technology
Battery: 24.0 MW
Total requested
24.0 MW
Queue status
Withdrawn
Entered queue
11 June 2021

Location

Marker shows the centre of Nassau County; the queue data does not give exact sites.

Power plants in New York · Transmission lines in New York

Other requests in Nassau County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem