United States βΊ Grid βΊ Interconnection queues βΊ New York
GAS Β· NYISOBrentwood
Brentwood is a 44.0 MW gas request built and operating in the NYISO interconnection queue, connecting to LIPA.
Request details
- Queue ID
- 85
- Grid region
- NYISO (New York)
- Utility / transmission owner
- LIPA
- Developer
- NYPA
- Connection point (POI)
- Brentwood 69 kV
- Location
- New York
- Technology
- Gas: 44.0 MW
- Total requested
- 44.0 MW
- Study phase
- SRIS,CY01
- Queue status
- Operational
- Entered queue
- 5 December 2000
Location
Marker shows the centre of County; the queue data does not give exact sites.
Other requests in County
- Vineyard Mid-Atlantic WestOffshore wind Β· 1,321 MW Β· in study
- Glenwood Gas PlantGas Β· 79.9 MW Β· built
- Glenwood Gas PlantGas Β· 79.9 MW Β· built
- BrentwoodGas Β· 44.0 MW Β· built
- OW Ocean Winds East 3Offshore wind Β· 1,600 MW Β· withdrawn
- EI Empire ESS IIWind + storage Β· 1,440 MW Β· withdrawn
- Vineyard Wind IOffshore wind Β· 1,403 MW Β· withdrawn
- Bluepoint Wind 4Offshore wind Β· 1,382 MW Β· withdrawn
- Vineyard Mid-Atlantic 3Offshore wind Β· 1,330 MW Β· withdrawn
- Vineyard Mid-Atlantic 2Offshore wind Β· 1,330 MW Β· withdrawn
- NY Wind - New Bridge RoadOffshore wind Β· 1,325 MW Β· withdrawn
- Bluepoint Wind 2Offshore wind Β· 1,310 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem