Battery Storage

Battery Storage is a 20.0 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Penobscot County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedSep 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1019
Grid region
ISO-NE (New England)
Connection point (POI)
Chester 46 kV
Location
Penobscot County, Maine
Technology
Battery: 20.0 MW
Total requested
20.0 MW
Service type
Energy only (ERIS)
Study phase
In Progress
Queue status
Withdrawn
Entered queue
24 April 2020
Proposed online date
April 2024
Withdrawn
September 2023

Location

Marker shows the centre of Penobscot County; the queue data does not give exact sites.

Power plants in Maine · Transmission lines in Maine

Other requests in Penobscot County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem