United States › Grid › Interconnection queues › Maine
BATTERY STORAGE · ISO-NEBattery Storage
Battery Storage is a 20.0 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Penobscot County, Maine.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2020 (completed)
- Withdrawn / abandonedSep 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1019
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Chester 46 kV
- Location
- Penobscot County, Maine
- Technology
- Battery: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- In Progress
- Queue status
- Withdrawn
- Entered queue
- 24 April 2020
- Proposed online date
- April 2024
- Withdrawn
- September 2023
Location
Marker shows the centre of Penobscot County; the queue data does not give exact sites.
Other requests in Penobscot County
- Millinocket Frequency ConversionHydro · 126 MW · built
- Great Northern - MillinocketHydro · 126 MW · built
- Millinocket Battery additonOther · 126 MW · built
- Passadumkeag WindparkOnshore wind · 40.0 MW · built
- Rollins Wind (Stetson Wind Phase II)Onshore wind · 27.8 MW · built
- Dundee WindOnshore wind · 27.0 MW · built
- Silver Maple WindOnshore wind · 20.0 MW · built
- Red Shield Acquisition - BiomassOther · 16.0 MW · built
- Georgia PacificOther · 16.0 MW · built
- Red Shield( Georgia Pacific/Old Town)Other · 16.0 MW · built
- Red Shield Acquisition #5Gas · 9.5 MW · built
- Pisgah MountainOnshore wind · 9.0 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem