United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
ONSHORE WIND Β· MISOOnshore wind project H050, Meeker County
Onshore wind project H050, Meeker County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Meeker County, Minnesota.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2008 (completed)
- Withdrawn / abandonedJun 2012 (project stopped here)
- ConsentedJun 2012 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- H050
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- GRE Big Swan 115 kV Substation
- Location
- Meeker County, Minnesota
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- DPP - SIS
- Queue status
- Withdrawn
- Entered queue
- 12 June 2008
- Agreement signed
- 26 June 2012
- Proposed online date
- December 2011
- Withdrawn
- June 2012
Location
Marker shows the centre of Meeker County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Meeker County
- Battery storage project J4194, Meeker CountyBattery storage Β· 500 MW Β· in study
- Onshore wind project J4193, Meeker CountyOnshore wind Β· 200 MW Β· in study
- Onshore wind project G971, Meeker CountyOnshore wind Β· 20.0 MW Β· built
- Onshore wind project G685, Meeker CountyOnshore wind Β· 20.0 MW Β· built
- Onshore wind project J625, Meeker CountyOnshore wind Β· 400 MW Β· withdrawn
- Onshore wind project J627, Meeker CountyOnshore wind Β· 400 MW Β· withdrawn
- Onshore wind project J626, Meeker CountyOnshore wind Β· 400 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem