United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISOHickory Hill Energy Storage
Hickory Hill Energy Storage is a 100 MW battery storage request withdrawn in the NYISO interconnection queue, in Montgomery County, New York, connecting to NM-NG.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- C24-200
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- BGTF US Development Holdings LLC
- Connection point (POI)
- Inghams-Meco-Marshville Line 15/12 115kV
- Location
- Montgomery County, New York
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Queue status
- Withdrawn
- Entered queue
- 19 September 2024
Location
Marker shows the centre of Montgomery County; the queue data does not give exact sites.
Other requests in Montgomery County
- Mill Point SolarSolar + storage · 250 MW · in study
- Kce NY 2Battery storage · 200 MW · in study
- Flat Creek SolarSolar · 200 MW · in study
- Amsterdam SolarSolar · 150 MW · in study
- Flat Creek SolarSolar · 100 MW · in study
- Mill Point Solar IISolar + storage · 100 MW · in study
- Mohawk SolarSolar · 90.5 MW · in study
- High River SolarSolar · 90.0 MW · built
- High River SolarSolar · 90.0 MW · built
- PattersonvilleSolar · 20.0 MW · built
- Grissom SolarSolar · 20.0 MW · built
- Regan SolarSolar · 20.0 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem