SOLAR Β· SPPSolar project GEN-2022-SR8, Franklin County
Solar project GEN-2022-SR8, Franklin County is a 210 MW solar request withdrawn in the SPP interconnection queue, in Franklin County, Nebraska.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2022 (completed)
- Withdrawn / abandonedMar 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2022-SR8
- Grid region
- SPP (Southwest Power Pool)
- Connection point (POI)
- Macon 345 kV Substation
- Location
- Franklin County, Nebraska
- Technology
- Solar: 210 MW
- Total requested
- 210 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 27 July 2022
- Withdrawn
- March 2023
Location
Marker shows the centre of Franklin County; the queue data does not give exact sites.