πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Nebraska

BATTERY STORAGE Β· SPP

Battery storage project GEN-2022-SR7, Franklin County

Battery storage project GEN-2022-SR7, Franklin County is a 210 MW battery storage request withdrawn in the SPP interconnection queue, in Franklin County, Nebraska.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2022 (completed)
  2. Withdrawn / abandonedMar 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingDec 2018 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2022-SR7
Grid region
SPP (Southwest Power Pool)
Connection point (POI)
Macon 345 kV Substation
Location
Franklin County, Nebraska
Technology
Battery: 210 MW
Total requested
210 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
27 July 2022
Proposed online date
December 2018
Came online
December 2018
Withdrawn
March 2023

Location

Marker shows the centre of Franklin County; the queue data does not give exact sites.

Power plants in Nebraska Β· Transmission lines in Nebraska

Other requests in Franklin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem