United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

SOLAR + STORAGE Β· WEST

Solar + storage project Q80, Spokane County

Solar + storage project Q80, Spokane County is a 19.0 MW solar + storage request withdrawn in the West interconnection queue, in Spokane County, Washington, connecting to Avista Utilities.

Queue statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandonedFeb 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Q80
Grid region
West (non-ISO utilities)
Utility / transmission owner
Avista Utilities
Connection point (POI)
South Fairchild 115kV Tap
Location
Spokane County, Washington
Technology
Solar: 19.0 MW Β· Battery
Total requested
19.0 MW
Service type
Network resource (NRIS)
Study phase
Facility Study
Queue status
Withdrawn
Proposed online date
June 2026
Withdrawn
February 2024

Location

Marker shows the centre of Spokane County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Spokane County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem