United States βΊ Grid βΊ Interconnection queues βΊ Ohio
ONSHORE WIND Β· PJMOnshore wind project U2-062, Darke County
Onshore wind project U2-062, Darke County is a 188 MW onshore wind request withdrawn in the PJM interconnection queue, in Darke County, Ohio, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2008 (completed)
- Withdrawn / abandonedJul 2013 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- U2-062
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Randolph 138kV
- Location
- Darke County, Ohio
- Technology
- Wind: 188 MW
- Total requested
- 188 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 9 July 2008
- Proposed online date
- September 2012
- Withdrawn
- July 2013
Location
Marker shows the centre of Darke County; the queue data does not give exact sites.
Other requests in Darke County
- Greenville Electric Generating StationGas Β· 14.0 MW Β· built
- Onshore wind project V3-016, Darke CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project AD2-087, Darke CountyOnshore wind Β· 200 MW Β· withdrawn
- Solar project AF2-079, Darke CountySolar Β· 165 MW Β· withdrawn
- Solar project AF2-218, Darke CountySolar Β· 50.0 MW Β· withdrawn
- Onshore wind project W2-067, Darke CountyOnshore wind Β· 50.0 MW Β· withdrawn
- Onshore wind project W1-041, Darke CountyOnshore wind Β· 50.0 MW Β· withdrawn
- Solar project X2-077, Darke CountySolar Β· 10.0 MW Β· withdrawn
- Greenville SolarSolar Β· 3.4 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem