πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Ohio

ONSHORE WIND Β· PJM

Onshore wind project W1-041, Darke County

Onshore wind project W1-041, Darke County is a 50.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Darke County, Ohio, connecting to Dayton.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2010 (completed)
  2. Withdrawn / abandonedJan 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
W1-041
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dayton
Connection point (POI)
W. Milton-Greenville
Location
Darke County, Ohio
Technology
Wind: 50.0 MW
Total requested
50.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Withdrawn
Entered queue
26 February 2010
Proposed online date
December 2012
Withdrawn
January 2012

Location

Marker shows the centre of Darke County; the queue data does not give exact sites.

Power plants in Ohio Β· Transmission lines in Ohio

Other requests in Darke County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem