United States βΊ Grid βΊ Interconnection queues βΊ Ohio
ONSHORE WIND Β· PJMOnshore wind project W1-041, Darke County
Onshore wind project W1-041, Darke County is a 50.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Darke County, Ohio, connecting to Dayton.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2010 (completed)
- Withdrawn / abandonedJan 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- W1-041
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dayton
- Connection point (POI)
- W. Milton-Greenville
- Location
- Darke County, Ohio
- Technology
- Wind: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 26 February 2010
- Proposed online date
- December 2012
- Withdrawn
- January 2012
Location
Marker shows the centre of Darke County; the queue data does not give exact sites.
Other requests in Darke County
- Greenville Electric Generating StationGas Β· 14.0 MW Β· built
- Onshore wind project V3-016, Darke CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project AD2-087, Darke CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project U2-062, Darke CountyOnshore wind Β· 188 MW Β· withdrawn
- Solar project AF2-079, Darke CountySolar Β· 165 MW Β· withdrawn
- Solar project AF2-218, Darke CountySolar Β· 50.0 MW Β· withdrawn
- Onshore wind project W2-067, Darke CountyOnshore wind Β· 50.0 MW Β· withdrawn
- Solar project X2-077, Darke CountySolar Β· 10.0 MW Β· withdrawn
- Greenville SolarSolar Β· 3.4 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem