United States βΊ Grid βΊ Interconnection queues βΊ North Carolina
SOLAR Β· PJMSolar project AA1-134, Gates County
Solar project AA1-134, Gates County is a 80.0 MW solar request withdrawn in the PJM interconnection queue, in Gates County, North Carolina, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2014 (completed)
- Withdrawn / abandonedFeb 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AA1-134
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Sunbury-WinFall 230kV
- Location
- Gates County, North Carolina
- Technology
- Solar: 80.0 MW
- Total requested
- 80.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 31 October 2014
- Proposed online date
- October 2015
- Withdrawn
- February 2017
Location
Marker shows the centre of Gates County; the queue data does not give exact sites.
Power plants in North Carolina Β· Transmission lines in North Carolina
Other requests in Gates County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem