United States β€Ί Grid β€Ί Interconnection queues β€Ί Oklahoma

SOLAR + STORAGE Β· SPP

Solar + storage project GEN-2024-024, Woodward County

Solar + storage project GEN-2024-024, Woodward County is a 100 MW solar + storage request withdrawn in the SPP interconnection queue, in Woodward County, Oklahoma, connecting to WFEC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2024 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2024-024
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
WFEC
Connection point (POI)
Iodine - Mooreland Switchyard 138 kV
Location
Woodward County, Oklahoma
Technology
Solar: 100 MW Β· Battery
Total requested
100 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
30 October 2024
Proposed online date
July 2028
Withdrawn
December 2025

Location

Marker shows the centre of Woodward County; the queue data does not give exact sites.

Power plants in Oklahoma Β· Transmission lines in Oklahoma

Other requests in Woodward County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem