United States βΊ Grid βΊ Interconnection queues βΊ Wisconsin
GAS Β· MISOGas project G117, Douglas County
Gas project G117, Douglas County is a 324 MW gas request withdrawn in the MISO interconnection queue, in Douglas County, Wisconsin.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2001 (completed)
- Withdrawn / abandoned (project stopped here)
- ConsentedDec 2008 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G117
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Stinson 115 kV Substation
- Location
- Douglas County, Wisconsin
- Technology
- Gas: 324 MW
- Total requested
- 324 MW
- Study phase
- Network Upgrade
- Queue status
- Withdrawn
- Entered queue
- 9 August 2001
- Agreement signed
- 19 December 2008
- Proposed online date
- December 2003
Location
Marker shows the centre of Douglas County; the queue data does not give exact sites.
Power plants in Wisconsin Β· Transmission lines in Wisconsin
Other requests in Douglas County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem