πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Wisconsin

GAS Β· MISO

Gas project G117, Douglas County

Gas project G117, Douglas County is a 324 MW gas request withdrawn in the MISO interconnection queue, in Douglas County, Wisconsin.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2001 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedDec 2008 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G117
Grid region
MISO (Midcontinent)
Connection point (POI)
Stinson 115 kV Substation
Location
Douglas County, Wisconsin
Technology
Gas: 324 MW
Total requested
324 MW
Study phase
Network Upgrade
Queue status
Withdrawn
Entered queue
9 August 2001
Agreement signed
19 December 2008
Proposed online date
December 2003

Location

Marker shows the centre of Douglas County; the queue data does not give exact sites.

Power plants in Wisconsin Β· Transmission lines in Wisconsin

Other requests in Douglas County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem