ONSHORE WIND · PJMCentral Solar Park
Central Solar Park is a 45.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Roanoke County, Virginia, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2010 (completed)
- Withdrawn / abandonedMar 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- W1-036
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Matt Funk-Tech Drive 138kV
- Location
- Roanoke County, Virginia
- Technology
- Wind: 45.0 MW
- Total requested
- 45.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 26 February 2010
- Proposed online date
- October 2012
- Withdrawn
- March 2012
Location
Marker shows the centre of Roanoke County; the queue data does not give exact sites.