πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Virginia

ONSHORE WIND Β· PJM

Onshore wind project P53, Roanoke County

Onshore wind project P53, Roanoke County is a 81.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Roanoke County, Virginia, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2006 (completed)
  2. Withdrawn / abandonedAug 2006 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
P53
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Bent Mtn. 138kV
Location
Roanoke County, Virginia
Technology
Wind: 81.0 MW
Total requested
81.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study
Queue status
Withdrawn
Entered queue
30 January 2006
Proposed online date
December 2008
Withdrawn
August 2006

Location

Marker shows the centre of Roanoke County; the queue data does not give exact sites.

Power plants in Virginia Β· Transmission lines in Virginia

Other requests in Roanoke County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem