United States › Grid › Interconnection queues › New York

BATTERY STORAGE · NYISO

Intrepid Storage 69

Intrepid Storage 69 is a 50.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Nassau County, New York, connecting to LIPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2019 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
912
Grid region
NYISO (New York)
Utility / transmission owner
LIPA
Developer
Hecate Grid Intrepid 1 LLC
Connection point (POI)
Barrett to Oil City 33-317 and 33-222
Location
Nassau County, New York
Technology
Battery: 50.0 MW
Total requested
50.0 MW
Queue status
Withdrawn
Entered queue
2 October 2019

Location

Marker shows the centre of Nassau County; the queue data does not give exact sites.

Power plants in New York · Transmission lines in New York

Other requests in Nassau County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem