ONSHORE WIND Β· PJMOnshore wind project V4-074, Hancock County
Onshore wind project V4-074, Hancock County is a 1,000 MW onshore wind request withdrawn in the PJM interconnection queue, in Hancock County, Illinois, connecting to ComEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2010 (completed)
- Withdrawn / abandonedJan 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- V4-074
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- Quad Cities Wind
- Location
- Hancock County, Illinois
- Technology
- Wind: 1,000 MW
- Total requested
- 1,000 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 29 January 2010
- Proposed online date
- December 2013
- Withdrawn
- January 2012
Location
Marker shows the centre of Hancock County; the queue data does not give exact sites.
Other requests in Hancock County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem