United States βΊ Grid βΊ Interconnection queues βΊ Illinois
ONSHORE WIND Β· MISOOnshore wind project G775, Hancock County
Onshore wind project G775, Hancock County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Hancock County, Illinois.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2007 (completed)
- Withdrawn / abandonedFeb 2015 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G775
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Niota - Macomb 138 kV
- Location
- Hancock County, Illinois
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 27 March 2007
- Withdrawn
- February 2015
Location
Marker shows the centre of Hancock County; the queue data does not give exact sites.
Other requests in Hancock County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem