SOLAR + STORAGE Β· PJMSolar + storage project AI1-140, Wayne County
Solar + storage project AI1-140, Wayne County is a 40.0 MW solar + storage request withdrawn in the PJM interconnection queue, in Wayne County, Indiana, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedJun 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AI1-140
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Selma Parker - Richmond 138 kV
- Location
- Wayne County, Indiana
- Technology
- Solar: 40.0 MW Β· Battery
- Total requested
- 40.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 9 September 2022
- Proposed online date
- June 2025
- Withdrawn
- June 2025
Location
Marker shows the centre of Wayne County; the queue data does not give exact sites.
Other requests in Wayne County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem