SOLAR Β· PJMSolar project AH1-200, Wyoming County
Solar project AH1-200, Wyoming County is a 12.0 MW solar request withdrawn in the PJM interconnection queue, in Wyoming County, Pennsylvania, connecting to PPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2021 (completed)
- Withdrawn / abandonedOct 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH1-200
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PPL
- Connection point (POI)
- Compressor 605 69kV
- Location
- Wyoming County, Pennsylvania
- Technology
- Solar: 12.0 MW
- Total requested
- 12.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 4 September 2021
- Proposed online date
- December 2023
- Withdrawn
- October 2023
Location
Marker shows the centre of Wyoming County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Wyoming County
- Mehoopany WFOnshore wind Β· 150 MW Β· built
- Mehoopany PlantGas Β· 20.0 MW Β· built
- Oxbow Creek Generation PlantGas Β· 18.3 MW Β· built
- Roundtop Energy ProjectGas Β· 15.4 MW Β· built
- Oxbow Creek Generation PlantGas Β· 1.6 MW Β· built
- Oxbow Creek EnergyGas Β· 1.5 MW Β· built
- Gas project AE2-067, Wyoming CountyGas Β· 20.0 MW Β· withdrawn
- Florey Knob Generating StationGas Β· 19.9 MW Β· withdrawn
- Solar project AG2-439, Wyoming CountySolar Β· 9.8 MW Β· withdrawn
- Oxbow 34.5 kVSolar Β· 9.8 MW Β· withdrawn
- Gas project Y2-104, Wyoming CountyGas Β· 6.6 MW Β· withdrawn
- Gas project Y3-113, Wyoming CountyGas Β· 3.4 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem