United States βΊ Grid βΊ Interconnection queues βΊ Oklahoma
ONSHORE WIND Β· SPPOnshore wind project GEN-2017-143, Wagoner County
Onshore wind project GEN-2017-143, Wagoner County is a 227 MW onshore wind request withdrawn in the SPP interconnection queue, in Wagoner County, Oklahoma.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2017 (completed)
- Withdrawn / abandonedDec 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2017-143
- Grid region
- SPP (Southwest Power Pool)
- Connection point (POI)
- Clarksville 345kV Substation
- Location
- Wagoner County, Oklahoma
- Technology
- Wind: 227 MW
- Total requested
- 227 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 22 November 2017
- Proposed online date
- December 2020
- Withdrawn
- December 2018
Location
Marker shows the centre of Wagoner County; the queue data does not give exact sites.
Other requests in Wagoner County
- Solar project GEN-2017-141, Wagoner CountySolar Β· 242 MW Β· agreement signed
- Solar project GEN-2017-140, Wagoner CountySolar Β· 160 MW Β· agreement signed
- Battery storage project GEN-2024-118, Wagoner CountyBattery storage Β· 199 MW Β· in study
- Solar project GEN-2017-180, Wagoner CountySolar Β· 250 MW Β· withdrawn
- Onshore wind project GEN-2017-122, Wagoner CountyOnshore wind Β· 234 MW Β· withdrawn
- Onshore wind project GEN-2017-129, Wagoner CountyOnshore wind Β· 222 MW Β· withdrawn
- Battery storage project GEN-2017-170, Wagoner CountyBattery storage Β· 52.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem