United States βΊ Grid βΊ Interconnection queues βΊ North Carolina
BATTERY STORAGE Β· SOUTHEASTBattery storage project 956180, Rockingham County
Battery storage project 956180, Rockingham County is a 99.0 MW battery storage request withdrawn in the Southeast interconnection queue, in Rockingham County, North Carolina, connecting to Duke Energy Carolinas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 956180
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Carolinas
- Connection point (POI)
- Dan River CTCC Station 100 kV
- Location
- Rockingham County, North Carolina
- Technology
- Battery: 99.0 MW
- Total requested
- 99.0 MW
- Service type
- NRIS and ERIS
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 20 June 2024
Location
Marker shows the centre of Rockingham County; the queue data does not give exact sites.
Power plants in North Carolina Β· Transmission lines in North Carolina
Other requests in Rockingham County
- Battery storage project 956294, Rockingham CountyBattery storage Β· 115 MW Β· in study
- Gas project 957510, Rockingham CountyGas Β· 33.0 MW Β· in study
- Gas project 957509, Rockingham CountyGas Β· 33.0 MW Β· in study
- Gas project 957511, Rockingham CountyGas Β· 33.0 MW Β· in study
- Gas project 957447, Rockingham CountyGas Β· 33.0 MW Β· in study
- Gas project 957437, Rockingham CountyGas Β· 33.0 MW Β· in study
- Gas project 956974, Rockingham CountyGas Β· 28.0 MW Β· in study
- Solar project 977888, Rockingham CountySolar Β· 5.0 MW Β· in study
- Solar + storage project AF1-312, Rockingham CountySolar + storage Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem