United States βΊ Grid βΊ Interconnection queues βΊ Oklahoma
SOLAR + STORAGE Β· SPPSolar + storage project GEN-2023-148, Jackson County
Solar + storage project GEN-2023-148, Jackson County is a 110 MW solar + storage request withdrawn in the SPP interconnection queue, in Jackson County, Oklahoma, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2023 (completed)
- Withdrawn / abandonedMar 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2023-148
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Russell - Lake Pauline 138 kV Line
- Location
- Jackson County, Oklahoma
- Technology
- Solar: 110 MW Β· Battery
- Total requested
- 110 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 2 October 2023
- Proposed online date
- December 2027
- Withdrawn
- March 2024
Location
Marker shows the centre of Jackson County; the queue data does not give exact sites.
Other requests in Jackson County
- Solar project GEN-2024-158, Jackson CountySolar Β· 190 MW Β· in study
- Solar + storage project GEN-2024-161, Jackson CountySolar + storage Β· 170 MW Β· in study
- Solar + storage project GEN-2020-012, Jackson CountySolar + storage Β· 113 MW Β· in study
- Solar project GEN-2022-003, Jackson CountySolar Β· 125 MW Β· withdrawn
- Solar project GEN-2015-085, Jackson CountySolar Β· 122 MW Β· withdrawn
- Solar project GEN-2024-086, Jackson CountySolar Β· 120 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem