BATTERY STORAGE Β· MISOBattery storage project J2789, Jasper County
Battery storage project J2789, Jasper County is a 250 MW battery storage request withdrawn in the MISO interconnection queue, in Jasper County, Illinois, connecting to AMEREN ILLINOIS.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedMar 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2789
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN ILLINOIS
- Connection point (POI)
- 4NEWTON-4ROBNSNAM 138kV
- Location
- Jasper County, Illinois
- Technology
- Battery: 250 MW
- Total requested
- 250 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 14 September 2022
- Proposed online date
- November 2025
- Withdrawn
- March 2023
Location
Marker shows the centre of Jasper County; the queue data does not give exact sites.
Other requests in Jasper County
- Solar + storage project J1198, Jasper CountySolar + storage Β· 51.8 MW Β· agreement signed
- Solar project J2922, Jasper CountySolar Β· 250 MW Β· in study
- Solar + storage project J3528, Jasper CountySolar + storage Β· 225 MW Β· in study
- Solar project J2131, Jasper CountySolar Β· 150 MW Β· in study
- Solar project J3674, Jasper CountySolar Β· 100 MW Β· in study
- Solar project J2918, Jasper CountySolar Β· 97.0 MW Β· in study
- Coal project G436, Jasper CountyCoal Β· 50.0 MW Β· built
- Coal project G984, Jasper CountyCoal Β· 42.0 MW Β· built
- Coal project G983, Jasper CountyCoal Β· 42.0 MW Β· built
- Onshore wind project J3995, Jasper CountyOnshore wind Β· 300 MW Β· withdrawn
- Solar project J881, Jasper CountySolar Β· 45.0 MW Β· withdrawn
- Solar project J3759, Jasper CountySolar Β· 15.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem