SOLAR Β· PJM

Be-Astor

Be-Astor is a 16.6 MW solar request withdrawn in the PJM interconnection queue, in Bedford County, Pennsylvania, connecting to PENELEC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2019 (completed)
  2. Withdrawn / abandonedJun 2024 (project stopped here)
  3. ConsentedFeb 2021 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AE2-249
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PENELEC
Connection point (POI)
Bedford North-Pennsylvania Hollow 23 kV
Location
Bedford County, Pennsylvania
Technology
Solar: 16.6 MW
Total requested
16.6 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Withdrawn
Entered queue
25 March 2019
Agreement signed
23 February 2021
Proposed online date
July 2021
Withdrawn
June 2024

Location

Marker shows the centre of Bedford County; the queue data does not give exact sites.

Power plants in Pennsylvania Β· Transmission lines in Pennsylvania

Other requests in Bedford County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem