United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
SOLAR Β· PJMBe-Astor
Be-Astor is a 16.6 MW solar request withdrawn in the PJM interconnection queue, in Bedford County, Pennsylvania, connecting to PENELEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2019 (completed)
- Withdrawn / abandonedJun 2024 (project stopped here)
- ConsentedFeb 2021 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AE2-249
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PENELEC
- Connection point (POI)
- Bedford North-Pennsylvania Hollow 23 kV
- Location
- Bedford County, Pennsylvania
- Technology
- Solar: 16.6 MW
- Total requested
- 16.6 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Withdrawn
- Entered queue
- 25 March 2019
- Agreement signed
- 23 February 2021
- Proposed online date
- July 2021
- Withdrawn
- June 2024
Location
Marker shows the centre of Bedford County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Bedford County
- Solar project AI2-476, Bedford CountySolar Β· 5.8 MW Β· in study
- Solar project AI2-477, Bedford CountySolar Β· 5.8 MW Β· in study
- Solar project AI2-308, Bedford CountySolar Β· 4.4 MW Β· in study
- Onshore wind project Q04, Bedford CountyOnshore wind Β· 140 MW Β· withdrawn
- Solar + storage project AE1-128, Bedford CountySolar + storage Β· 120 MW Β· withdrawn
- Onshore wind project Q62, Bedford CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project S49, Bedford CountyOnshore wind Β· 90.0 MW Β· withdrawn
- Solar project AH1-246, Bedford CountySolar Β· 80.0 MW Β· withdrawn
- Dunning Mountain WFOnshore wind Β· 76.0 MW Β· withdrawn
- Battery storage project AH2-229, Bedford CountyBattery storage Β· 50.0 MW Β· withdrawn
- Solar project AF2-339, Bedford CountySolar Β· 20.0 MW Β· withdrawn
- Solar project AF2-338, Bedford CountySolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem