United States › Grid › Interconnection queues › Pennsylvania
ONSHORE WIND · PJMDunning Mountain WF
Dunning Mountain WF is a 76.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Bedford County, Pennsylvania, connecting to PENELEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2005 (completed)
- Withdrawn / abandonedJun 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- O56
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PENELEC
- Connection point (POI)
- Osterburg East 115kV
- Location
- Bedford County, Pennsylvania
- Technology
- Wind: 76.0 MW
- Total requested
- 76.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 28 July 2005
- Proposed online date
- March 2013
- Withdrawn
- June 2012
Location
Marker shows the centre of Bedford County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Bedford County
- Solar project AI2-476, Bedford CountySolar · 5.8 MW · in study
- Solar project AI2-477, Bedford CountySolar · 5.8 MW · in study
- Solar project AI2-308, Bedford CountySolar · 4.4 MW · in study
- Onshore wind project Q04, Bedford CountyOnshore wind · 140 MW · withdrawn
- Solar + storage project AE1-128, Bedford CountySolar + storage · 120 MW · withdrawn
- Onshore wind project Q62, Bedford CountyOnshore wind · 100 MW · withdrawn
- Onshore wind project S49, Bedford CountyOnshore wind · 90.0 MW · withdrawn
- Solar project AH1-246, Bedford CountySolar · 80.0 MW · withdrawn
- Battery storage project AH2-229, Bedford CountyBattery storage · 50.0 MW · withdrawn
- Solar project AF2-339, Bedford CountySolar · 20.0 MW · withdrawn
- Solar project AF2-338, Bedford CountySolar · 20.0 MW · withdrawn
- Snake Spring Solar I & IISolar · 20.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem