United States βΊ Grid βΊ Interconnection queues βΊ Florida
GAS Β· SOUTHEASTGas project 14
Gas project 14 is a 1,148 MW gas request built and operating in the Southeast interconnection queue, connecting to Seminole Electric Cooperative.
Request details
- Queue ID
- 14
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Seminole Electric Cooperative
- Connection point (POI)
- SGS Switchyard
- Location
- Florida
- Technology
- Gas: 1,148 MW
- Total requested
- 1,148 MW
- Service type
- Energy only (ERIS)
- Study phase
- Study Phase: System Impact; Status: Completed and unit in-service.
- Queue status
- Operational
- Entered queue
- 9 March 2016
- Agreement signed
- 13 November 2017
- Proposed online date
- June 2021
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem