United States β€Ί Grid β€Ί Interconnection queues β€Ί Louisiana

SOLAR + STORAGE Β· MISO

Solar + storage project J2336, Union Parish County

Solar + storage project J2336, Union Parish County is a 125 MW solar + storage request withdrawn in the MISO interconnection queue, in Union Parish County, Louisiana, connecting to ENTERGY LOUISIANA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedJul 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J2336
Grid region
MISO (Midcontinent)
Utility / transmission owner
ENTERGY LOUISIANA
Connection point (POI)
Sterlington - Downsville 115 kV Line
Location
Union Parish County, Louisiana
Technology
Solar: 125 MW Β· Battery
Total requested
125 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
13 September 2022
Proposed online date
August 2025
Withdrawn
July 2025

Location

Marker shows the centre of Union Parish County; the queue data does not give exact sites.

Power plants in Louisiana Β· Transmission lines in Louisiana

Other requests in Union Parish County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem