United States β€Ί Grid β€Ί Interconnection queues β€Ί Louisiana

SOLAR + STORAGE Β· MISO

Solar + storage project J3839, Union Parish County

Solar + storage project J3839, Union Parish County is a 50.0 MW solar + storage request withdrawn in the MISO interconnection queue, in Union Parish County, Louisiana, connecting to ENTERGY LOUISIANA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2024 (completed)
  2. Withdrawn / abandonedJan 2026 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3839
Grid region
MISO (Midcontinent)
Utility / transmission owner
ENTERGY LOUISIANA
Connection point (POI)
MARION SS (LAGEN) - HUTTIG SS 115.0kV
Location
Union Parish County, Louisiana
Technology
Solar: 50.0 MW Β· Battery
Total requested
50.0 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
31 May 2024
Proposed online date
July 2028
Withdrawn
January 2026

Location

Marker shows the centre of Union Parish County; the queue data does not give exact sites.

Power plants in Louisiana Β· Transmission lines in Louisiana

Other requests in Union Parish County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem