United States βΊ Grid βΊ Interconnection queues βΊ Michigan
SOLAR Β· MISOSolar project J1919, Ingham County
Solar project J1919, Ingham County is a 132 MW solar request withdrawn in the MISO interconnection queue, in Ingham County, Michigan, connecting to METC.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2021 (completed)
- Withdrawn / abandonedNov 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1919
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- METC
- Connection point (POI)
- Oneida-Majestic 345 kV
- Location
- Ingham County, Michigan
- Technology
- Solar: 132 MW
- Total requested
- 132 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 3
- Queue status
- Withdrawn
- Entered queue
- 24 August 2021
- Proposed online date
- November 2023
- Withdrawn
- November 2021
Location
Marker shows the centre of Ingham County; the queue data does not give exact sites.
Other requests in Ingham County
- Solar project J1399, Ingham CountySolar Β· 90.0 MW Β· agreement signed
- Solar project J3838, Ingham CountySolar Β· 225 MW Β· in study
- Battery storage project J2555, Ingham CountyBattery storage Β· 100 MW Β· in study
- Onshore wind project J1666, Ingham CountyOnshore wind Β· 300 MW Β· withdrawn
- Solar project J1608, Ingham CountySolar Β· 100 MW Β· withdrawn
- Solar project J2807, Ingham CountySolar Β· 100 MW Β· withdrawn
- Solar project J1090, Ingham CountySolar Β· 90.0 MW Β· withdrawn
- Solar project J1117, Ingham CountySolar Β· 80.0 MW Β· withdrawn
- Other project G226.1, Ingham CountyOther Β· 60.0 MW Β· withdrawn
- Other project G227, Ingham CountyOther Β· 24.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem