πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

ONSHORE WIND Β· SPP

Onshore wind project GEN-2010-007, Hutchinson County

Onshore wind project GEN-2010-007, Hutchinson County is a 73.8 MW onshore wind request withdrawn in the SPP interconnection queue, in Hutchinson County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2010 (completed)
  2. Withdrawn / abandonedMay 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2010-007
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Tap Pringle - Riverview 115kV
Location
Hutchinson County, Texas
Technology
Wind: 73.8 MW
Total requested
73.8 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
26 March 2010
Proposed online date
December 2011
Withdrawn
May 2012

Location

Marker shows the centre of Hutchinson County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Hutchinson County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem