United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· SPPSolar project GEN-2022-063, Hutchinson County
Solar project GEN-2022-063, Hutchinson County is a 350 MW solar request withdrawn in the SPP interconnection queue, in Hutchinson County, Texas, connecting to SPS.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2022 (completed)
- Withdrawn / abandonedNov 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingDec 2025 (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2022-063
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Connection point (POI)
- Pringle 115kV Substation
- Location
- Hutchinson County, Texas
- Technology
- Solar: 350 MW
- Total requested
- 350 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 13 July 2022
- Proposed online date
- December 2025
- Came online
- December 2025
- Withdrawn
- November 2023
Location
Marker shows the centre of Hutchinson County; the queue data does not give exact sites.
Other requests in Hutchinson County
- Panhandle Flagship Solar 2Solar + storage Β· 304 MW Β· agreement signed
- Panhandle Flagship Solar 3Solar + storage Β· 260 MW Β· agreement signed
- Solar project GEN-2024-078, Hutchinson CountySolar Β· 300 MW Β· in study
- Solar project GEN-2024-077, Hutchinson CountySolar Β· 300 MW Β· in study
- Gas project GEN-2005-007, Hutchinson CountyGas Β· 260 MW Β· withdrawn
- Onshore wind project GEN-2007-005, Hutchinson CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project GEN-2007-033, Hutchinson CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project GEN-2003-016, Hutchinson CountyOnshore wind Β· 101 MW Β· withdrawn
- Onshore wind project GEN-2005-002, Hutchinson CountyOnshore wind Β· 80.0 MW Β· withdrawn
- Onshore wind project GEN-2010-007, Hutchinson CountyOnshore wind Β· 73.8 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem