United States βΊ Grid βΊ Interconnection queues βΊ Arkansas
BATTERY STORAGE Β· SPPBattery storage project GEN-2022-049, Franklin County
Battery storage project GEN-2022-049, Franklin County is a 150 MW battery storage request withdrawn in the SPP interconnection queue, in Franklin County, Arkansas, connecting to OGE.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2022 (completed)
- Withdrawn / abandonedNov 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingDec 2025 (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2022-049
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- OGE
- Connection point (POI)
- Grand Prairie 161 kV Tap
- Location
- Franklin County, Arkansas
- Technology
- Battery: 150 MW
- Total requested
- 150 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 23 June 2022
- Proposed online date
- December 2025
- Came online
- December 2025
- Withdrawn
- November 2023
Location
Marker shows the centre of Franklin County; the queue data does not give exact sites.
Other requests in Franklin County
- Solar project GEN-2021-033, Franklin CountySolar Β· 204 MW Β· agreement signed
- Solar project GEN-2017-231, Franklin CountySolar Β· 72.5 MW Β· agreement signed
- Battery storage project GEN-2024-SR2, Franklin CountyBattery storage Β· 72.5 MW Β· agreement signed
- Gas project GEN-2024-003, Franklin CountyGas Β· 102 MW Β· in study
- Solar project GEN-2024-312, Franklin CountySolar Β· 50.0 MW Β· in study
- Gas project GEN-2015-019, Franklin CountyGas Β· 60.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem