Solar project J3770, Randolph County

Solar project J3770, Randolph County is a 45.8 MW solar request withdrawn in the MISO interconnection queue, in Randolph County, Illinois, connecting to AMEREN ILLINOIS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2024 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3770
Grid region
MISO (Midcontinent)
Utility / transmission owner
AMEREN ILLINOIS
Connection point (POI)
The Baldwin 345kV substation found in the drop down. But please note the POI is same as J1202. The p
Location
Randolph County, Illinois
Technology
Solar: 45.8 MW
Total requested
45.8 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 1
Queue status
Withdrawn
Entered queue
1 April 2024
Proposed online date
April 2027
Withdrawn
December 2025

Location

Marker shows the centre of Randolph County; the queue data does not give exact sites.

Power plants in Illinois Β· Transmission lines in Illinois

Other requests in Randolph County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem