United States › Grid › Interconnection queues › Pennsylvania
SOLAR · PJMLimestone Solar
Limestone Solar is a 20.0 MW solar request with a signed interconnection agreement in the PJM interconnection queue, in Union County, Pennsylvania, connecting to PPL.
Queue statusConsented
- PlanningQueued Sep 2019 (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingTarget Sep 2027 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- AF1-338
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PPL
- Connection point (POI)
- Laurelton-Mifflinburg 69 kV
- Location
- Union County, Pennsylvania
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Active
- Entered queue
- 27 September 2019
- Proposed online date
- September 2027
Location
Marker shows the centre of Union County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Union County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem