SOLAR Β· MISO

Solar project J2671, Arenac County

Solar project J2671, Arenac County is a 150 MW solar request withdrawn in the MISO interconnection queue, in Arenac County, Michigan, connecting to METC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedAug 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J2671
Grid region
MISO (Midcontinent)
Utility / transmission owner
METC
Connection point (POI)
Whittemore to Twining 138 kV
Location
Arenac County, Michigan
Technology
Solar: 150 MW
Total requested
150 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
14 September 2022
Proposed online date
November 2025
Withdrawn
August 2025

Location

Marker shows the centre of Arenac County; the queue data does not give exact sites.