Solar project J2876, Arenac County

Solar project J2876, Arenac County is a 175 MW solar request in interconnection study in the MISO interconnection queue, in Arenac County, Michigan, connecting to METC.

Queue statusIn planning
  1. PlanningQueued Sep 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Nov 2025 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
J2876
Grid region
MISO (Midcontinent)
Utility / transmission owner
METC
Connection point (POI)
Whittemore to Twining 138 kV
Location
Arenac County, Michigan
Technology
Solar: 175 MW
Total requested
175 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Active
Entered queue
14 September 2022
Proposed online date
November 2025

Location

Marker shows the centre of Arenac County; the queue data does not give exact sites.

Power plants in Michigan · Transmission lines in Michigan

Other requests in Arenac County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem