SOLAR + STORAGE Β· WESTAE199SB
AE199SB is a 199 MW solar + storage request withdrawn in the West interconnection queue, in Chaves County, New Mexico, connecting to El Paso Electric Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2025 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- Q25-LG-6-11-0
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- El Paso Electric Company
- Connection point (POI)
- Amrad-Empire 345 kV Line
- Location
- Chaves County, New Mexico
- Technology
- Solar: 199 MW Β· Battery
- Total requested
- 199 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 11 June 2025
- Proposed online date
- December 2029
Location
Marker shows the centre of Chaves County; the queue data does not give exact sites.
Power plants in New Mexico Β· Transmission lines in New Mexico
Other requests in Chaves County
- EC500W ProjectOnshore wind Β· 247 MW Β· agreement signed
- Solar + storage project ERAS-2025-030, Chaves CountySolar + storage Β· 350 MW Β· in study
- Solar + storage project GEN-2024-271, Chaves CountySolar + storage Β· 250 MW Β· in study
- Solar project GEN-2024-311, Chaves CountySolar Β· 225 MW Β· in study
- Battery storage project GEN-2024-186, Chaves CountyBattery storage Β· 199 MW Β· in study
- Battery storage project GEN-2024-324, Chaves CountyBattery storage Β· 160 MW Β· in study
- Battery storage project GEN-2024-325, Chaves CountyBattery storage Β· 150 MW Β· in study
- Battery storage project GEN-2024-310, Chaves CountyBattery storage Β· 75.0 MW Β· in study
- Battery storage project GEN-2025-SR32, Chaves CountyBattery storage Β· 50.0 MW Β· in study
- Battery storage project GEN-2025-SR27, Chaves CountyBattery storage Β· 50.0 MW Β· in study
- Onshore wind project GEN-2008-022, Chaves CountyOnshore wind Β· 300 MW Β· built
- Onshore wind project GEN-2001-033, Chaves CountyOnshore wind Β· 120 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem