ONSHORE WIND Β· SPP

Onshore wind project GEN-2015-012, Lincoln County

Onshore wind project GEN-2015-012, Lincoln County is a 300 MW onshore wind request withdrawn in the SPP interconnection queue, in Lincoln County, Colorado, connecting to SUNC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2015 (completed)
  2. Withdrawn / abandonedSep 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2015-012
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SUNC
Connection point (POI)
Mingo 345kV
Location
Lincoln County, Colorado
Technology
Wind: 300 MW
Total requested
300 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
26 March 2015
Proposed online date
January 2017
Withdrawn
September 2015

Location

Marker shows the centre of Lincoln County; the queue data does not give exact sites.

Power plants in Colorado Β· Transmission lines in Colorado

Other requests in Lincoln County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem