GAS Β· WESTSummit PNW
Summit PNW is a 520 MW gas request withdrawn in the West interconnection queue, in Clatsop County, Oregon, connecting to Summit Power Northwest Project, LLC.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2001 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G19-01
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Summit Power Northwest Project, LLC
- Developer
- Summit Power Northwest Project, LLC
- Connection point (POI)
- Allston 230 KV
- Location
- Clatsop County, Oregon
- Technology
- Gas: 520 MW
- Total requested
- 520 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 25 January 2001
- Proposed online date
- October 2003
Location
Marker shows the centre of Clatsop County; the queue data does not give exact sites.
Other requests in Clatsop County
- Hydro project 352, Clatsop CountyHydro Β· 0.0 MW Β· built
- Summit/WestwardGas Β· 536 MW Β· withdrawn
- Gas project 65, Clatsop CountyGas Β· 145 MW Β· withdrawn
- Onshore wind project G0653, Clatsop CountyOnshore wind Β· 117 MW Β· withdrawn
- ClatskanieGas Β· 65.0 MW Β· withdrawn
- Other project G0415, Clatsop CountyOther Β· 20.0 MW Β· withdrawn
- Onshore wind project 164-A, Clatsop CountyOnshore wind Β· 2.6 MW Β· withdrawn
- Onshore wind project 196-A, Clatsop CountyOnshore wind Β· 2.6 MW Β· withdrawn
- Onshore wind project 196-B, Clatsop CountyOnshore wind Β· 1.7 MW Β· withdrawn
- Onshore wind project 164-B, Clatsop CountyOnshore wind Β· 1.7 MW Β· withdrawn
- Onshore wind project 353, Clatsop CountyOnshore wind Β· 0.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem