United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· SPPSolar project GEN-2018-097, Parmer County
Solar project GEN-2018-097, Parmer County is a 100 MW solar request withdrawn in the SPP interconnection queue, in Parmer County, Texas, connecting to SPS.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2018 (completed)
- Withdrawn / abandonedSep 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2018-097
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Connection point (POI)
- Tolk 230kV Substation
- Location
- Parmer County, Texas
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 21 November 2018
- Proposed online date
- December 2027
- Withdrawn
- September 2023
Location
Marker shows the centre of Parmer County; the queue data does not give exact sites.
Other requests in Parmer County
- Onshore wind project GEN-2018-099, Parmer CountyOnshore wind Β· 300 MW Β· agreement signed
- Onshore wind project GEN-2017-158, Parmer CountyOnshore wind Β· 265 MW Β· agreement signed
- Mariah Del Este WindOnshore wind Β· 153 MW Β· suspended
- Scandia Wind DEFOnshore wind Β· 600 MW Β· withdrawn
- Onshore wind project GEN-2022-217, Parmer CountyOnshore wind Β· 275 MW Β· withdrawn
- Onshore wind project GEN-2016-099, Parmer CountyOnshore wind Β· 250 MW Β· withdrawn
- Solar project GEN-2018-124, Parmer CountySolar Β· 200 MW Β· withdrawn
- Solar project GEN-2018-112, Parmer CountySolar Β· 185 MW Β· withdrawn
- Battery storage project GEN-2018-111, Parmer CountyBattery storage Β· 75.0 MW Β· withdrawn
- Onshore wind project GEN-2008-116, Parmer CountyOnshore wind Β· 70.0 MW Β· withdrawn
- Onshore wind project GEN-2008-052, Parmer CountyOnshore wind Β· 65.0 MW Β· withdrawn
- Onshore wind project GEN-2016-117, Parmer CountyOnshore wind Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem