United States βΊ Grid βΊ Interconnection queues βΊ Illinois
BATTERY STORAGE Β· MISOBattery storage project J1975, Coles County
Battery storage project J1975, Coles County is a 40.0 MW battery storage request withdrawn in the MISO interconnection queue, in Coles County, Illinois, connecting to AMEREN ILLINOIS.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2022 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1975
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN ILLINOIS
- Connection point (POI)
- Mattoon West
- Location
- Coles County, Illinois
- Technology
- Battery: 40.0 MW
- Total requested
- 40.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 23 March 2022
- Proposed online date
- October 2025
- Withdrawn
- December 2025
Location
Marker shows the centre of Coles County; the queue data does not give exact sites.
Other requests in Coles County
- Solar project J1232, Coles CountySolar Β· 99.0 MW Β· agreement signed
- Wind + storage project J2128, Coles CountyWind + storage Β· 300 MW Β· in study
- Solar project J3012, Coles CountySolar Β· 287 MW Β· in study
- Onshore wind project J3391, Coles CountyOnshore wind Β· 200 MW Β· in study
- Battery storage project J3968, Coles CountyBattery storage Β· 100 MW Β· in study
- Solar project J949, Coles CountySolar Β· 200 MW Β· built
- Coal project G661, Coles CountyCoal Β· 726 MW Β· withdrawn
- Onshore wind project J1757, Coles CountyOnshore wind Β· 300 MW Β· withdrawn
- Battery storage project J2504, Coles CountyBattery storage Β· 300 MW Β· withdrawn
- Onshore wind project J973, Coles CountyOnshore wind Β· 250 MW Β· withdrawn
- Solar project J2393, Coles CountySolar Β· 164 MW Β· withdrawn
- Solar project J1974, Coles CountySolar Β· 160 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem