United States βΊ Grid βΊ Interconnection queues βΊ Missouri
SOLAR Β· SPPSolar project GEN-2021-050, Henry County
Solar project GEN-2021-050, Henry County is a 200 MW solar request withdrawn in the SPP interconnection queue, in Henry County, Missouri, connecting to KCPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2021 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2021-050
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- KCPL
- Connection point (POI)
- 161kV Stilwell-Clinton Line
- Location
- Henry County, Missouri
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 30 April 2021
- Proposed online date
- September 2028
Location
Marker shows the centre of Henry County; the queue data does not give exact sites.
Other requests in Henry County
- Solar project GEN-2017-108, Henry CountySolar Β· 400 MW Β· agreement signed
- Solar + storage project GEN-2020-072, Henry CountySolar + storage Β· 150 MW Β· agreement signed
- Battery storage project GEN-2025-SR1, Henry CountyBattery storage Β· 400 MW Β· in study
- Solar project GEN-2024-289, Henry CountySolar Β· 350 MW Β· in study
- Solar project GEN-2022-168, Henry CountySolar Β· 380 MW Β· withdrawn
- Battery storage project GEN-2021-051, Henry CountyBattery storage Β· 75.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem