BATTERY STORAGE Β· SPP

Battery storage project GEN-2021-051, Henry County

Battery storage project GEN-2021-051, Henry County is a 75.0 MW battery storage request withdrawn in the SPP interconnection queue, in Henry County, Missouri, connecting to KCPL.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedOct 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2021-051
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
KCPL
Connection point (POI)
161kV Stilwell-Clinton Line
Location
Henry County, Missouri
Technology
Battery: 75.0 MW
Total requested
75.0 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
30 April 2021
Proposed online date
September 2027
Withdrawn
October 2025

Location

Marker shows the centre of Henry County; the queue data does not give exact sites.

Power plants in Missouri Β· Transmission lines in Missouri

Other requests in Henry County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem