ONSHORE WIND Β· PJMOnshore wind project AG2-452, Auglaize County
Onshore wind project AG2-452, Auglaize County is a 300 MW onshore wind request withdrawn in the PJM interconnection queue, in Auglaize County, Ohio, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2021 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-452
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- SW Lima - Shelby 345 kV
- Location
- Auglaize County, Ohio
- Technology
- Wind: 300 MW
- Total requested
- 300 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 30 March 2021
- Proposed online date
- March 2024
- Withdrawn
- December 2024
Location
Marker shows the centre of Auglaize County; the queue data does not give exact sites.
Other requests in Auglaize County
- Solar project AF1-113, Auglaize CountySolar Β· 180 MW Β· withdrawn
- Solar project AF1-085, Auglaize CountySolar Β· 77.0 MW Β· withdrawn
- Solar project AF2-059, Auglaize CountySolar Β· 20.0 MW Β· withdrawn
- Solar project AG2-033, Auglaize CountySolar Β· 20.0 MW Β· withdrawn
- Solar project AG1-025, Auglaize CountySolar Β· 20.0 MW Β· withdrawn
- Minster III ESSBattery storage Β· 19.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem